SureCrete DK 120 Polyaspartic Clear Concrete Sealer
About
SureCrete’s Dura-Kote PFC-120 is a specially formulated 67% solids hybrid solvent based polyaspartic coating designed for application over interior concrete, cement based overlays, or as a top finish coat on epoxy systems.
Specs
- Coverage: approx 300-400 sq. ft per gallon per coat
- VOC Rating: less than 330 g/L
Instructions
SURFACE PREP
The principles for surface preparation for DK 120 are aligned with other coating systems placed on concrete or cement based overlays, the substrate must be:
- Clean: The surface must be free of dust, dirt, oil, grease, paints, glues, sealers, curing agents, efflorescence, chemical contaminants, rust, algae, mildew and other foreign matter that may serve as a bond breaker or prevent proper adhesion. To remove coatings, paint, sealers, glue from concrete, etc. best results are achieved through diamond grinding or shot blasting.
- Cured: Any concrete must be sufficiently cured to have complete hydration, approximately 28 days depending on temperatures & humidity. Cement based overlays typically cure sufficiently within 2 – 3 days.
- Sound: No system should be placed on flaking or spalling concrete or cement based overlay. If the surface is delaminating, or divots are present, diamond grinding, shot blasting, or other mechanical means should be used to remove the delaminating areas. Depending upon size of area, patching may be required prior to application of Dura-Kote PFC-120. Flash Patch or Deep Level is an excellent choice as a patching product to complement the system. Refer to their respective spec. sheets. As a thin mil coating, Dura-Kote PFC-120, will never bridge construction joints in concrete. Large expansive slabs should have planned appropriate flexible caulks to allow for movement. Cracks in concrete may likewise require treatment: evaluate crack as static or structural to set expectation of treatment. Refer to spec. sheet on SCT-22 Crack and Spall Treatment.
- Profiled:
- Concrete: For a proper bond, the surface of concrete must be opened up or roughed up to feel like 80 – 180 grit sandpaper. This profile is best accomplished through diamond grinding or shot blasting. Proper profile should follow the standard established by the International Concrete Repair Institute (ICRI) Technical Guideline no. 03732 for Concrete Surface Profile (CSP). The established profile is categorized as CSP-1 through CSP-3. Customarily cement-based overlays do not require profiling.
- Finish or Top Coat:Screen the preceding coat with a 100 grit sanding screen on a rotational floor machine. This screening will ensure not only a good bond between coats, but also eliminate any debris or dust that may have settled onto the preceding coat as it was curing. Follow screening with vacuuming. Follow vacuuming with a micro-fiber wipe with a solvent such as xylene, acetone, or denatured alcohol. Listed below are some common systems requiring a Finish or Top Coat:
- Dura-Kote Flakes
- Dura-Kote Metallics
- Dura-Kote Pigmented Epoxy 100
- Dura-Kote Pigmented Epoxy WB
- Any other Dura-Kote specialty system
- Limit Moisture: Since Dura-Kote PFC-120 is not vapor permeable and due to the uncertainty of vapor barriers placed beneath concrete, testing prior to application is appropriate.
- Plastic sheet test (ASTM-D-4263) can often identify excessive moisture vapor transmission. Tape all 4 sides of an 18” (45 cm) square of clear plastic to the slab and leave in place for 16 hours. Any condensation formed or darkening of the slab beneath the plastic indicates the surface is too wet for polyurethane.
- Calcium Chloride test (ASTM-F-1869) will quantify the amount of moisture that is transmitted to surface of the slab. The moisture measurement is expressed in terms of pounds (kg) per 1,000 ft² (m²) per 24 hours. Measurements that are in excess of 3 pounds per 1,000 ft² (1.4 kg per 100 m²) over 24 hours are too wet for polyaspartic. Follow directions of test kit manufacturer.
Note: these observations and measurements may be inherently flawed as they are “snapshots in time”. These tests serve only as guidelines.
TEMPERATURE/CURE
Avoid application on extremely cold or hot days or during wet, foggy weather. Basic rules include:
- Apply with ambient and surface temperatures ranging above 32°F (0°C) and below 90°F (32°C) and that will remain within ranges for at least 12 hours following application.
- Surface temperature must be a minimum 5°F (3°C) above dew point.
- Relative humidity should be below 75%.
Cure Rates @ 80°F (27°C) Cure Rates @ 40°F (4°C)
Dry to touch = 1 - 2 hr. Dry to touch = 4 - 5 hr.
Light traffic = 3 - 4 hr. Light traffic = 24 - 36 hr.
Heavy Traffic = 24 - 36 hr. Heavy Traffic = 3 - 4 days
Full cure = 1 – 2 days Full cure = 7 days
APPLICATION
Planning
- Product is flammable, turn off all fuel burning appliances and pilot lights. Be certain there are no potential sources of ignition.
- Provide for ventilation so that vapors do not accumulate.
- Select appropriate PPE (personal protection equipment). Use of a NIOSH approved respirator is required. Refer to SDS.
- Work across the narrowest dimension of an area where practical.
- Work to an exit from wet product.
- To track coverage rate for each premeasured kit, after establishing room dimensions, before mixing commences, place a short piece of masking tape on the wall to correspond to the “distance” one kit should cover. Product should cover approximately 300 – 400 ft² per gal. (28 – 37 m² per 3.8 liter) 4 – 5 mils wet.
Mask all areas requiring protection
Mixing and handling:
- Organize mixing station that neither has to relocate, nor block the progress of application. Staging is critical so that Part A and part B are not confused with one another or mixed too far in advance. Once A and B are mixed, the catalyzed product should be placed on the floor within 30 minutes. If left in the pail too long, product will cure at an accelerated rate rendering it useless.
- Pour 1 part B into 4 parts A. Note that kits are premeasured for convenience.
- Mechanically mix (with Jiffy style mixer) both parts A and B for 1 minute at medium speed.
- Transfer contents into an appropriately sized pan our pail equipped with a roller grid.
- Do not leave pail upside down to drain onto floor. Any unmixed portion of A or B that may have accidentally been placed onto side of pail can now drain down onto the floor, creating a spot that will not cure.
- Clean out or replace mixing pails and mixer blades in a reasonable fashion, so that the chemistry of A and B remain consistent, especially over large projects.
First Coat:
- Select applicator (product designed to be rolled, never atomize product through spraying)
- As a thin mil system, most commonly a roller ranging in nap size from mohair to 3/8” (9.5 mm) is appropriate.
- Rollers should be premium quality with phenolic core.
- “De-fuzz” roller by wrapping tightly with masking tape and removing tape.
- As a top coat over Dura-Kote Flakes, a squeegee may be appropriate for spreading prior to back rolling.
- Large areas may require 18” (46 cm) rollers and wider squeegees
- Saturate roller in pan or pail with roller grid, and remove excess product to prevent excessive dripping. Any drips require rolling out.
- Apply product in an area that can comfortably be covered with the material on a wet roller. Before the roller begins to dry out, become tacky and “pull”, backroll the same area. Do not over work, as product has self-leveling characteristics.
- Saturate roller again and cover another similar size area maintaining a wet edge between the two areas. Large expansive areas will require sufficient manpower and / or appropriately sized rollers to accomplish the wet edge. To illustrate: an area that has dried for 20 minutes will “pull” on the roller as wet product is applied next to it, leaving an unsatisfactory finish. Roller covers will require replacing periodically to prevent catalyzed product from setting up on roller cover or contaminating more freshly placed material. Areas of overlap must be wet on wet. Do not over work by excessive rolling.
- Cut in by brush areas adjacent to walls. Note: First coat may “stand alone” as a single coat depending upon application selected, or applicator and client choice. First coat may also serve as Finish or Top Coat for several of Dura-Kote specialty systems, some are listed below:
- Dura-Kote Flakes
- Dura-Kote Metallics
- Dura-Kote Pigmented Epoxy 100
- Dura-Kote Pigmented Epoxy WB
- Any other Dura-Kote specialty system
Second Coat
If first coat has cured dry to the touch and is no longer tacky (refer to cure rates listed above as a guide) repeat all steps of application listed above. Planning, masking, mixing and handling, and application are identical in second coat.
If first coat has cured beyond 8 – 12 hr. @ 60°F - 80°F (16°C - 27°C) or if dust or debris has settled into it as it cured, it must be sanded with a rotational floor machine equipped with a 100 grit sanding screen. Follow screening with vacuuming. Follow vacuuming with a micro-fiber wipe with a solvent such as xylene, acetone, or denatured alcohol.
Sacrificial Coat
A sacrificial coat is not required, but will add further protection to the finished product. SureFinish provides a protective sacrificial coat, a measure of slip resistance, and is available in gloss and matte, as a simple mop on product.
Slip Resistance
Two recognized US agencies have issued directives on minimum coefficient of friction, OSHA (Occupational Safety and Health Administration) and Department of Justice through the ADA (Americans of Disabilities Act). ADA is the more stringent of the two. ADA directs that accessible walkways have a minimum coefficient of friction of 0.6. Ramps have been directed to be 0.8. The applicator assumes the responsibility to meet these standards. Areas that may become wet, oily, or greasy require special attention. Refer to spec. sheets on SureGrip (Additive) and its accompanying coefficient of friction table.
Suitability Sample
Due to condition specific sites, always prepare and adequate number of test areas. Wear protection system and aesthetic suitability for products' intended use should be included. On site sample approval is especially critical on substantial, heavy traffic situation or custom coloration.
Clean-Up
Before DK 120 dries; spills and tools can be cleaned up with a solvent such xylene or acetone.
Disposal
Contact your local government household hazardous waste coordinator for information on disposal of unused product. Upon curing, left over catalyzed product is not hazardous.
Limitations
- For use by trained professionals that have read the complete SDS.
- Product is strictly for interior use, upon well drained concrete slab with appropriate vapor barrier, subject to not hydrostatic pressure.
- When masking use caution while taping to a floor that is not completely cured, especially at edges, as delamination may occur.
- Protect from metal wheel traffic and some furniture where point of contact may be damaging.
- Chemicals used in tire manufacturing may be detrimental to all sealers from vehicular parking.